As a rule, I'm not a big flag waver, but I do enjoy this particular month of towels.
And LB's sweater is making great progress. I'm onto the sleeves, done two at a time. I just need to pay enough attention to increase every 3/4 inches and to remember to stop at the correct row of stripe at the armpit. It's likely to be his anniversary present (7/17).
No comments:
Post a Comment